Official name OLYMPUS 1
Alternative name Olympus 1
Cospar ID 1989-053A
Norad ID 20122
Launch date 1989-07-12
Launch site FRGUI
Launch vehicle Ariane-3
Country/Organization International
Type application Communication, experimental
Operator ESA
RCS size LARGE
Decay date ON ORBIT
Period (min) 1420.56
Inclination (deg) 13.06
Perigee (km) 35435
Apogee (km) 35528
Eccentricity 0.00131054211349577
Mean motion (revs. per day) 1.0136847440446
Semi-Major axis (km) 41859.635
Raan (deg) 339.6791
Arg of perigee (deg) 341.6155
Shape Box + 2 Pan
Mass (kg) 2595
Height (m) 5.6
Width (m) 2.7
Depth (m) 2.7
Span (m^2) 25.7
Lifetime 5 years
Contractors British Aerospace BAe (prime); Alenia Spazio, Marconi Space and Alcatel-Bell (payloads)
Equipment 2 Ku-band BSS transponder, 4 Ku-band SMS-transponders, 2 Ka-band transponders, Ku-/Ka-band propagation beacon
Propulsion R-4D-12
Configuration L-Sat Bus
Power 2 deployable solar arrays, batteries

The last Ariane-3 lofted the European communications technology demonstration satellite, Olympus F1 (originally named L-Sat 1), into transfer orbit. It carried four communications payloads introducing new satellite services and techniques to European users.

  • A powerful Ku-band direct broadcast system (EIRP is 62.5 dBW) offered one channel for Italian TV and one for international programming throughout Europe; both transmit as 12 GHz, signals can be received on 45 cm ground antennas.
  • A 12/14 GHz Ku-band specialized services payload accomodated switching and frequency reuse experiments, videoconferencing and data distribution.
  • A 20/30 GHz Ka-band payload offered point-to-point and multipoint videoconferencing, tele-eduction and low-speed data handling.
  • A 12/20/30 GHz package performed propagation research.

Built by British Aerospace for ESA, Olympus 1 measured 2.9 by 2.7 by 5.5 m. Solar arrays, spanning 25.6 m, provided 3.6 kW of power. It had a 5-year design life. The Olympus bus was designed to handle double the power, mass and service life requirements on future missions. A single burn of its bipropellant liquid apogee engine gave the satellite a soft ride towards its assigned station at 19 deg. w, where it arrived on August 3.

In January 1991 the south solar panel stopped tracking the sun, which reduced available power to about 1.8 kW. On 29. May 1991 a problem with an attitude control appeared and due to some incorrect commands to correct the problem uplinked from Fucino Earth Station Italy the satellite started tumbling, and drifted off station. Finally on 19. June 1992 the Darmstadt Control Centre regained control of Olympus, but not before the satellite had completely drifted around the Earth. The manoevers used up a lot of the station keeping fuel, but Olympus was put back into service at 19°W on 7. August 1992.

On 12. August 1993, control was lost again after an impact with a meteor from the annual Perseid meteor shower. Olympus started spinning. The attempt to stabilize the craft used up most of the remaining propellant, leaving an insufficient ammount for further operation. With the remaining fuel, Olympus was sent to a graveyard orbit and finally decomissioned on 12. August 1993.

Satellite COSPAR Date LS Launch Vehicle Remarks
OLYMPUS 1 1989-053A 1989-07-12 FRGUI Ariane-3